Work with Previous Architecture Firms

Lake Oswego constructed this pumping station as part of a new water treatment plant. Located in the Clackamas River near its confluence with the Willamette, it provides up to 30 million gallons a day to the plant. It included carefully constructed screens and modifciations of the river channel to protect small salmon during their trip to the Pacific. Similarity to a spacecraft is coincidental.
Firm: MWA Architects Inc
Role: Designer, Project Manager, Project Architect, Construction Administrator
Status : Completed 2013

The city of Oak Harbor built a new waste water treatment facility on the banks of the Puget Sound. It was designed to be integrated into an existing waterfront park. This included smell mitigation measures, and complete reconstruction of the park. The administration facility (shown above) has become the logo for the town of Oak Harbor.
Firm: MWA Architects Inc
Role: Designer, Project Manager, Project Architect, Construction Administrator
Status : Completed 2018

Olympia Crest Apartments - Olympia WA
Three new apartment buildings added to an existing complex in Olympia, WA. The project included new site amenities and a playground.
Firm: MWA Architects Inc
Role: Designer, Project Architect
Status : Completed 2023

Westmoreland Union Manor Energy Efficiency Upgrade - Portland OR
An existing active senior housing complex that serves retired union members. The facility includes apartments for over 300 people. The project removed and replaced the exterior skin along with new balconies. Each unit was given its own individual HVAC system, allowing custom temperature control for residents.
Firm: MWA Architects Inc
Role: Designer, Project Architect
Status : Completed 2018

Washington Park Reservoir - Portland OR
To comply with federal clean water regulations, Portland was required to cover its existing historic gravity fed water reservoir with underground tanks. The existing historic structures were renovated, and a new fountain was built over the top of the new tank that replicates the original. Upon completion the reservoirs will be open to the public.
Firm: MWA Architects Inc
Role: Designer, Project Manager, Project Architect
Status : Complete 2026

CHAD M SANDERSON ARCHITECTURE LLC
OREGON AND WASHINGTON
www.cmsarchitect.com